HUMAN FACTORS ENGINEERING OF INTERFACES – CONNECTING CONTROL CENTRES
by Lynne Collis CEng MIET
Why Connect Control Centres?
-
Why connect Control Centres
-
Safety Problems
-
Why Interfaces Fail
-
European Dimensions
-
Case Studies in Human-centred Interface Engineering
-
Overhead Line Equipment (OLE)
-
Maintenance
-
Channel Tunnel Rail Link (CTRL) Train
-
Describer Interfaces
-
Conclusions
|
|
|
You must be logged in to access a PDF of this article.
|
About the author(s)
Halcrow Group
|
|